ThermoFisher Scientific - Florence, SC
Architectural Contractor for spray dryer project Phase I & II
Project consisting of (2) independent spray dryer suites installed in existing 7 story API Manufacturing facility.
Framing, Drywall, and Insulation
Frames/Doors/Hardware Installation
Installation of various stainless-steel furnishings
Epoxy wall coatings
Design, fabricate, install stainless steel boom hoist for installation and removal of spray nozzles
Installation and removal of access scaffolding
Installation of gowning suite equipment per area classification
Misting showers, PAPR cabinet/charging station, Gowning accessories cabinet, Pass thrus
Stainless steel bumper guards and corner guards
Assisted client with coordination management
Procure and install high-speed roll up door
Procure and install stainless steel ceiling access doors
Pilot Plant floor replacement
Install hose storage station at truck unloading area
Various scaffolding and insulation of valves/heat exchangers/production (thermal blankets fabricated on site)
Exterior joint sealant of existing warehouse building
Contractor for Pilot Plant Platform and reactor design and relocation
Re-installed and refinished client supplied support platform and handrails
Install client supplied 200-Gal reactor vessel